Exhibition Solutions - Case Studies

Corenet Global Summit, Philadelphia USA

caption

A combination of Airframe T3 tubular system was used to construct the tower and Leitner modular panel system utilised to build the graphic wall and the storage cupboards/coffee area.

The main graphic panels which clad the tower were output on our large format printer using 300micron stoplight media.

Polycrystal 170micron seal was used to finish the panels.
The combination of materials was ideal for the application as the graphics were attached by magnetic strips to the tower, and double-sided tape to the Leitner system.This created the perfect match to butt the graphics over the two systems enabling the large train graphic panel to appear visually seamless.

The whole booth was built in one day, and ETC were able to work closely with the local Carpenters Union in the Convention Centre to ensure ultimate client satisfaction.Shirar O'Connor, Marketing Director of the UK Trade & Investment, British Consulate General, NewYork, who commissioned the booth was more than pleased with the design and build of the overall stand.

She commented: "Again, thank you for the excellent job - it was a pleasure seeing you again. I look forward to working with you more"

Recent case Studies